
Find The Best Chinese Factory
Payment Terms | T/T, L/C |
Delivery Time | 50-100 days |
Packaging Details | 1. Each tube is packed with pipe end caps and plastic bag individually, then packed into woven belt or wooden crate box. 2. As the clients' request. |
Application | boiler, heat exchanger, condenser |
Company Name | Suzhou orl power engineering co ., ltd |
Business Type | Manufacturer,Exporter,Seller |
Brands | ORL POWER ENGINEERING |
Employee Number | 500~600 |
Total Sales Annual | $5000000-$10000000 |
Factory Location | Zhangjiagang City, Jiangsu, China |